Layout
Draw a simple sequence showing what happens before the new floor and what must still pass through the room afterwards. Mark wet work, existing-floor removal, heating commissioning where relevant and access for assessment. Include the desired finished levels at doors and adjacent surfaces, so preparation is planned towards the selected covering. If the property is not yet available to inspect, state that clearly. An initial visual brief can progress the design while the physical preparation specification remains conditional on a proper survey after access.
Specification
Confirm what the receiving base is expected to be, then verify it when it becomes available. Moisture, stability, flatness and compatibility need assessment using the requirements for the intended floor system. Recent work can affect the programme, but generic drying assumptions cannot replace product guidance and appropriate checks. Material storage and conditioning are separate obligations from substrate readiness. Where a heating system is involved, obtain the relevant commissioning and flooring instructions and coordinate responsibility for following them before and after the installation stage.
Quotation
Ask the preparation proposal to identify which parts can be confirmed now and what requires inspection after handover. Allocate responsibility for access, removal, testing, repairs and clearing the room. Delivery should have its own receiving and suitable storage plan; it should not automatically trigger fitting. Agree how dates will be updated if the base needs additional work, and how any changed scope will be approved. Keep the eventual installer supplied with the preparation records and relevant instructions so readiness is established through evidence rather than a presumed completion message.