Layout
Keep a record of the desired finished floor alongside the condition survey, because the intended covering influences the base it needs. Mark locations where you have noticed movement, a hollow, a ridge or an unexplained height change without diagnosing the cause from appearance alone. Photograph these in wider room context so the assessor can locate them. Also show doorways, adjoining tiles and any fixed furniture. The target finish height and the proposed material should guide the assessment, rather than choosing a preparation depth in isolation.
Specification
Share any records of previous repairs, screeds, heating work or moisture tests, identifying who supplied them and when. A visible top layer may not reveal what supports it, so an agreed inspection opening or removal stage could be needed. Testing methods and acceptance limits must match the selected floor and preparation system. Some defects require repairs beyond smoothing; suspected structural problems need suitable professional assessment. Where old coverings or adhesives may present a hazard, have that assessed before disturbance rather than treating investigation as routine stripping.
Quotation
Request a written preparation scope that distinguishes verified findings from assumptions about concealed layers. It should name the proposed compatible system once established, describe removal and disposal responsibilities and explain the conditions for covering it. Ask how additional defects will be documented and authorised if discovered later. Keep drying, curing and any necessary reassessment in the programme, with fitting readiness treated as a condition rather than a calendar guarantee. The result should provide a clear handover to the floor installer, supported by relevant product information and recorded checks.